Quick answers
When stripping an old floor, laying new tiles and repainting a flat, in what order is the work done?
First the old flooring is broken out and the rubble bagged and cleared, then wall preparation and floor tiling (including skirtings) are completed, and the final coats of paint go on last.
When renovating a studio or apartment that needs both a new tiled floor and a full repaint, doing the stages in the right sequence keeps the new finishes clean and undamaged.

First, the old floor is broken out completely, the rubble is bagged up and cleared, and the bare slab is cleaned. All the heavy dust and wall knocks happen in this first phase.

Next, the walls are prepared, the new floor tiles and tile skirtings are laid and grouted, and the final coats of wall paint are applied — here replacing dark blue walls with a bright, soft tone.
Jobs that show it


Small Flat with a New Floor and New Colours
The old floor was taken up and new tiles were laid, and the dark blue walls were repainted in a soft grey-green.
See the job step by step
Kitchen Renovation from Drawing to Finish
An old kitchen was stripped out completely and replaced with a new grey kitchen with an island, built to the design drawing.
See the job step by step